Here's the rear
bulkhead installed. Before installing it, I drilled out a 1/4" hole and filled
it with thickened epoxy. After it completely cured, I drilled a 1/16" breather
hole in the center. This prevents the rear deck from being subject to implosion
forces from changing air temperature.